(a) Each company employing a special inspector shall, within 30 days following each inspection for certification as required by AS 18.60.390 for a boiler or unfired pressure vessel, file a report of the inspection with the Department of Labor and Workforce Development upon forms adopted by the department.
(b) In addition, a special inspector shall file with the department a report of an inspection that discloses a condition dangerous to life or property in a boiler or unfired pressure vessel.