CALIFORNIA STATUTES AND CODES
SECTIONS 8340-8341
PUBLIC UTILITIES CODE
SECTION 8340-8341
8340. For purposes of this chapter, the following terms have the
following meanings:
(a) "Baseload generation" means electricity generation from a
powerplant that is designed and intended to provide electricity at an
annualized plant capacity factor of at least 60 percent.
(b) "Combined-cycle natural gas" with respect to a powerplant
means the powerplant employs a combination of one or more gas
turbines and steam turbines in which electricity is produced in the
steam turbine from otherwise lost waste heat exiting from one or more
of the gas turbines.
(c) "Electric service provider" means an "electric service
provider" as defined in Section 218.3, but does not include
corporations or persons employing cogeneration technology or
producing electricity from other than a conventional power source
consistent with subdivision (b) of Section 218.
(d) "Greenhouse gases" means those gases listed in Section 38505
of the Health and Safety Code.
(e) "Load-serving entity" means every electrical corporation,
electric service provider, or community choice aggregator serving
end-use customers in the state.
(f) "Long-term financial commitment" means either a new ownership
investment in baseload generation or a new or renewed contract with a
term of five or more years, which includes procurement of baseload
generation.
(g) "Output-based methodology" means a greenhouse gases emission
performance standard that is expressed in pounds of greenhouse gases
emitted per megawatthour and factoring in the useful thermal energy
employed for purposes other than the generation of electricity.
(h) "Plant capacity factor" means the ratio of the electricity
produced during a given time period, measured in kilowatthours, to
the electricity the unit could have produced if it had been operated
at its rated capacity during that period, expressed in kilowatthours.
(i) "Powerplant" means a facility for the generation of
electricity, and includes one or more generating units at the same
location.
(j) "Zero- or low-carbon generating resource" means an electrical
generating resource that will generate electricity while producing
emissions of greenhouse gases at a rate substantially below the
greenhouse gases emission performance standard, as determined by the
commission.
8341. (a) No load-serving entity or local publicly owned electric
utility may enter into a long-term financial commitment unless any
baseload generation supplied under the long-term financial commitment
complies with the greenhouse gases emission performance standard
established by the commission, pursuant to subdivision (d), for a
load-serving entity, or by the Energy Commission, pursuant to
subdivision (e), for a local publicly owned electric utility.
(b) (1) The commission shall not approve a long-term financial
commitment by an electrical corporation unless any baseload
generation supplied under the long-term financial commitment complies
with the greenhouse gases emission performance standard established
by the commission pursuant to subdivision (d).
(2) The commission may, in order to enforce this section, review
any long-term financial commitment proposed to be entered into by an
electric service provider or a community choice aggregator.
(3) The commission shall adopt rules to enforce the requirements
of this section, for load-serving entities. The commission shall
adopt procedures, for all load-serving entities, to verify the
emissions of greenhouse gases from any baseload generation supplied
under a contract subject to the greenhouse gases emission performance
standard to ensure compliance with the standard.
(4) In determining whether a long-term financial commitment is for
baseload generation, the commission shall consider the design of the
powerplant and the intended use of the powerplant, as determined by
the commission based upon the electricity purchase contract, any
certification received from the Energy Commission, any other permit
or certificate necessary for the operation of the powerplant,
including a certificate of public convenience and necessity, any
procurement approval decision for the load-serving entity, and any
other matter the commission determines is relevant under the
circumstances.
(5) Costs incurred by an electrical corporation to comply with
this section, including those costs incurred for electricity purchase
agreements that are approved by the commission that comply with the
greenhouse gases emission performance standard, are to be treated as
procurement costs incurred pursuant to an approved procurement plan
and the commission shall ensure timely cost recovery of those costs
pursuant to paragraph (3) of subdivision (d) of Section 454.5.
(6) A long-term financial commitment entered into through a
contract approved by the commission, for electricity generated by a
zero- or low-carbon generating resource that is contracted for, on
behalf of consumers of this state on a cost-of-service basis, shall
be recoverable in rates, in a manner determined by the commission
consistent with Section 380. The commission may, after a hearing,
approve an increase from one-half to 1 percent in the return on
investment by the third party entering into the contract with an
electrical corporation with respect to investment in zero- or
low-carbon generation resources authorized pursuant to this
subdivision.
(c) (1) The Energy Commission shall adopt regulations for the
enforcement of this chapter with respect to a local publicly owned
electric utility.
(2) The Energy Commission may, in order to ensure compliance with
the greenhouse gases emission performance standard by local publicly
owned electric utilities, apply the procedures adopted by the
commission to verify the emissions of greenhouse gases from baseload
generation pursuant to subdivision (b).
(3) In determining whether a long-term financial commitment is for
baseload generation, the Energy Commission shall consider the design
of the powerplant and the intended use of the powerplant, as
determined by the Energy Commission based upon the electricity
purchase contract, any certification received from the Energy
Commission, any other permit for the operation of the powerplant, any
procurement approval decision for the load-serving entity, and any
other matter the Energy Commission determines is relevant under the
circumstances.
(d) (1) On or before February 1, 2007, the commission, through a
rulemaking proceeding, and in consultation with the Energy Commission
and the State Air Resources Board, shall establish a greenhouse
gases emission performance standard for all baseload generation of
load-serving entities, at a rate of emissions of greenhouse gases
that is no higher than the rate of emissions of greenhouse gases for
combined-cycle natural gas baseload generation. Enforcement of the
greenhouse gases emission performance standard shall begin
immediately upon the establishment of the standard. All
combined-cycle natural gas powerplants that are in operation, or that
have an Energy Commission final permit decision to operate as of
June 30, 2007, shall be deemed to be in compliance with the
greenhouse gases emission performance standard.
(2) In determining the rate of emissions of greenhouse gases for
baseload generation, the commission shall include the net emissions
resulting from the production of electricity by the baseload
generation.
(3) The commission shall establish an output-based methodology to
ensure that the calculation of emissions of greenhouse gases for
cogeneration recognizes the total usable energy output of the
process, and includes all greenhouse gases emitted by the facility in
the production of both electrical and thermal energy.
(4) In calculating the emissions of greenhouse gases by facilities
generating electricity from biomass, biogas, or landfill gas energy,
the commission shall consider net emissions from the process of
growing, processing, and generating the electricity from the fuel
source.
(5) Carbon dioxide that is injected in geological formations, so
as to prevent releases into the atmosphere, in compliance with
applicable laws and regulations shall not be counted as emissions of
the powerplant in determining compliance with the greenhouse gases
emissions performance standard.
(6) In adopting and implementing the greenhouse gases emission
performance standard, the commission, in consultation with the
Independent System Operator shall consider the effects of the
standard on system reliability and overall costs to electricity
customers.
(7) In developing and implementing the greenhouse gases emission
performance standard, the commission shall address long-term
purchases of electricity from unspecified sources in a manner
consistent with this chapter.
(8) In developing and implementing the greenhouse gases emission
performance standard, the commission shall consider and act in a
manner consistent with any rules adopted pursuant to Section 824a-3
of Title 16 of the United States Code.
(9) An electrical corporation that provides electric service to
75,000 or fewer retail end-use customers in California may file with
the commission a proposal for alternative compliance with this
section, which the commission may accept upon a showing by the
electrical corporation of both of the following:
(A) A majority of the electrical corporation's retail end-use
customers for electric service are located outside of California.
(B) The emissions of greenhouse gases to generate electricity for
the retail end-use customers of the electrical corporation are
subject to a review by the utility regulatory commission of at least
one other state in which the electrical corporation provides
regulated retail electric service.
(e) (1) On or before June 30, 2007, the Energy Commission, at a
duly noticed public hearing and in consultation with the commission
and the State Air Resources Board, shall establish a greenhouse gases
emission performance standard for all baseload generation of local
publicly owned electric utilities at a rate of emissions of
greenhouse gases that is no higher than the rate of emissions of
greenhouse gases for combined-cycle natural gas baseload generation.
The greenhouse gases emission performance standard established by the
Energy Commission for local publicly owned electric utilities shall
be consistent with the standard adopted by the commission for
load-serving entities. Enforcement of the greenhouse gases emission
performance standard shall begin immediately upon the establishment
of the standard. All combined-cycle natural gas powerplants that are
in operation, or that have an Energy Commission final permit decision
to operate as of June 30, 2007, shall be deemed to be in compliance
with the greenhouse gases emission performance standard.
(2) The greenhouse gases emission performance standard shall be
adopted by regulation pursuant to the Administrative Procedure Act
(Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3
of Title 2 of the Government Code).
(3) In determining the rate of emissions of greenhouse gases for
baseload generation, the Energy Commission shall include the net
emissions resulting from the production of electricity by the
baseload generation.
(4) The Energy Commission shall establish an output-based
methodology to ensure that the calculation of emissions of greenhouse
gases for cogeneration recognizes the total usable energy output of
the process, and includes all greenhouse gases emitted by the
facility in the production of both electrical and thermal energy.
(5) In calculating the emissions of greenhouse gases by facilities
generating electricity from biomass, biogas, or landfill gas energy,
the Energy Commission shall consider net emissions from the process
of growing, processing, and generating the electricity from the fuel
source.
(6) Carbon dioxide that is captured from the emissions of a
powerplant and that is permanently disposed of in geological
formations in compliance with applicable laws and regulations, shall
not be counted as emissions from the powerplant.
(7) In adopting and implementing the greenhouse gases emission
performance standard, the Energy Commission, in consultation with the
Independent System Operator, shall consider the effects of the
standard on system reliability and overall costs to electricity
customers.
(8) In developing and implementing the greenhouse gases emission
performance standard, the Energy Commission shall address long-term
purchases of electricity from unspecified sources in a manner
consistent with this chapter.
(9) In developing and implementing the greenhouse gases emission
performance standard, the Energy Commission shall consider and act in
a manner consistent with any rules adopted pursuant to Section
824a-3 of Title 16 of the United States Code.
(f) The Energy Commission, in a duly noticed public hearing and in
consultation with the commission and the State Air Resources Board,
shall reevaluate and continue, modify, or replace the greenhouse
gases emission performance standard when an enforceable greenhouse
gases emissions limit is established and in operation, that is
applicable to local publicly owned electric utilities.
(g) The commission, through a rulemaking proceeding and in
consultation with the Energy Commission and the State Air Resources
Board, shall reevaluate and continue, modify, or replace the
greenhouse gases emission performance standard when an enforceable
greenhouse gases emissions limit is established and in operation,
that is applicable to load-serving entities.