Sec. 16a-7b. Infrastructure criteria guidelines.
Sec. 16a-7b. Infrastructure criteria guidelines. (a) Not later than December 1,
2004, the Connecticut Energy Advisory Board shall develop infrastructure criteria
guidelines for the evaluation process under subsection (f) of section 16a-7c, which
guidelines shall be consistent with state environmental policy, state economic development policy, and the state's policy regarding the restructuring of the electric industry,
as set forth in section 16-244, and shall include, but not be limited to, the following: (1)
Environmental preference standards; (2) efficiency standards, including, but not limited
to, efficiency standards for transmission, generation and demand-side management; (3)
generation preference standards; (4) electric capacity, use trends and forecasted resource
needs; (5) natural gas capacity, use trends and forecasted resource needs; and (6) national
and regional reliability criteria applicable to the regional bulk power grid, as determined
in consultation with the regional independent system operator, as defined in section
16-1. In developing environmental preference standards, the board shall consider the
recommendations and findings of the task force established pursuant to section 25-157a
and Executive Order Number 26 of Governor John G. Rowland.
(b) No municipality other than a municipality operating a plant pursuant to chapter
101 or any special act and acting for purposes thereto may take an action to condemn,
in whole or in part, or restrict the operation of any existing and currently operating
energy facility, if such facility is first determined by the Department of Public Utility
Control, following a contested case proceeding, held in accordance with the provisions
of chapter 54, to comprise a critical, unique and unmovable component of the state's
energy infrastructure, unless the municipality first receives written approval from the
department, the Office of Policy and Management, the Connecticut Energy Advisory
Board and the Connecticut Siting Council that such taking would not have a detrimental
impact on the state's or region's ability to provide a particular energy resource to its
citizens.
(P.A. 03-140, S. 18; P.A. 04-191, S. 1; P.A. 07-242, S. 77, 110.)
History: P.A. 03-140 effective July 1, 2003; P.A. 04-191 added provision re consideration of recommendations and
findings of task force in developing environmental preference standards, effective July 1, 2004; P.A. 07-242 designated
existing provisions as Subsec. (a) and added Subsec. (b) re limitation on ability of municipality to condemn or restrict
operation of existing and operating energy facility, effective June 4, 2007, and deleted reference to the comprehensive
energy plan prepared pursuant to Sec. 16a-7a, effective July 1, 2007.