CONNECTICUT STATUTES AND CODES
Sec. 25-68b. Definitions.
Sec. 25-68b. Definitions. As used in sections 25-68b to 25-68h, inclusive:
(1) "Activity" means any proposed state action in a floodplain or any proposed state
action that impacts natural or man-made storm drainage facilities that are located on
property that the commissioner determines to be controlled by the state;
(2) "Base flood" means that flood which has a one per cent chance of being equaled
or exceeded in any year, as defined in regulations of the National Flood Insurance Program (44 CFR 59 et seq.) or that flood designated by the commissioner pursuant to
section 25-68c. Any flood so designated by the commissioner shall have at least a one
per cent chance of being equaled or exceeded in any year. Such flood may be designated
as the A or V zones on maps published by the National Flood Insurance Program. The
"base flood for a critical activity" means the flood that has at least a .2 per cent chance
of being equaled or exceeded in any year. Such flood may be designated as the B zone
on maps published for the National Flood Insurance Program;
(3) "Commissioner" means the Commissioner of Environmental Protection;
(4) "Critical activity" means any activity, including, but not limited to, the treatment, storage and disposal of hazardous waste and the siting of hospitals, housing for
the elderly, schools or residences, in the .2 per cent floodplain in which the commissioner
determines that a slight chance of flooding is too great;
(5) "Floodplain" means that area located within the real or theoretical limits of the
base flood or base flood for a critical activity;
(6) "Flood-proofing" means any combination of structural or nonstructural additions, changes or adjustments which reduce or eliminate flood damage to real estate
or improved real property, to water and sanitary facilities, and to structures and their
contents;
(7) "Freeboard" means a safety factor, expressed in feet above a calculated flood
level, that compensates for unknown factors contributing to flood heights greater than
the calculated height, including, but not limited to, ice jams, debris accumulations, wave
actions, obstructions of bridge openings and floodways, the effects of urbanization on the
hydrology of a watershed, loss of flood storage due to development and sedimentation of
a watercourse bed;
(8) "Proposed state action" means individual activities or a sequence of planned
activities proposed to be undertaken by a state department, institution or agency, any
state or federal grant or loan proposed to be used to fund a project that affects land use,
or proposed transfer of real property belonging to the state.
(P.A. 84-536, S. 1; P.A. 05-174, S. 1.)
History: P.A. 05-174 redefined "activity" in Subdiv. (1) and added Subdiv. (8) re definition of "proposed state action".
Connecticut Forms by Issue
Connecticut Law
Connecticut State Laws
Connecticut Court
Connecticut Agencies