               		§ 46-3-55 - Measurement and payment of energy flow
               		
               		
               	 	
               	 	               	 	
               	 	
               	 	
               	 		
O.C.G.A.    46-3-55   (2010)
   46-3-55.    Measurement and payment of energy flow 
      Consistent with the other provisions of this chapter, the energy flow shall be measured and paid for in the following manner:
      (1)  If  the distributed generation facilities are connected to the electric  service provider's distribution system on the customer generator's side  of the customer's meter, the electric service provider shall:
            (A)  Measure  the electricity produced or consumed during the billing period, in  accordance with normal metering practices using bidirectional metering;
            (B)  When  the electricity supplied by the electric service provider exceeds the  electricity generated by the customer's distributed generation, the  electricity shall be billed by the electric service provider, in  accordance with tariffs filed with the commission; or
            (C)  When  electricity generated by the customer's distributed generation system  exceeds the electricity supplied by the electric service provider, the  customer generator:
                  (i)  Shall be billed for the appropriate customer charges for that billing period; and
                  (ii)  Shall  be credited for the excess kilowatt-hours generated during the billing  period at an agreed to rate as filed with the commission, with this  kilowatt-hour credit appearing on the bill for the billing period; or
      (2)  If  the distributed generation facilities are connected to the electric  service provider's distribution system on the electric service  provider's side of the customer's meter, the electric service provider  shall:
            (A)  Measure the electricity  produced or consumed during the billing period, in accordance with  normal metering practices using single directional metering;
            (B)  Charge the customer generator a minimum monthly fee as established in Code Section 46-3-54; and
            (C)  If  there is electricity generated by the customer generator for the  billing period, the customer generator shall be compensated at an agreed  to rate as filed with the commission.
               	 	
               	 	
               	 	               	 	
               	 	               	 	               	  
               	 
               	 
               	 
               	 