236.030. In the case supposed in section 236.010, the personor corporation proposing to erect a dam shall file a petition inthe circuit court of the county in which it is proposed to erectsuch mill, electric power and light works, or other machinery, inconnection with the dam, and shall therein set forth:
(1) A description of the land and an abstract of the titlethereto;
(2) The name of the watercourse, and a description of thepoint at which it is proposed to erect such dam;
(3) The altitude of the dam which it is proposed to erect;and
(4) The kind of mill, electric power and light works, orother machinery, which it is proposed to connect with the dam.
(RSMo 1939 § 10288)Prior revisions: 1929 § 9159; 1919 § 7401; 1909 § 5458
(1961) This section was designed to promote the construction of mills and to protect the owners of land along watercourses and contemplated a permanent construction. It has no application to a temporary dam to enable the construction of a bridge. Rector v. Tobin Const. Co. (A.), 351 S.W.2d 816.