1. Selecting a construction manager at risk pursuant to the provisions of NRS 338.1691 to 338.1696, inclusive; and
2. Entering into separate contracts with a construction manager at risk:
(a) For preconstruction services, including, without limitation:
(1) Assisting the public body in determining whether scheduling or design problems exist that would delay the construction of the public work;
(2) Estimating the cost of the labor and material for the public work; and
(3) Assisting the public body in determining whether the public work can be constructed within the public body’s budget; and
(b) To construct the public work.
(Added to NRS by 2007, 2891; A 2009, 437, effective July 1, 2011)