1. The application is incomplete;
2. The prescribed fees have not been paid;
3. The proposed use is not temporary;
4. There is no water available from the proposed source of supply without exceeding the perennial yield or safe yield of that source;
5. The proposed use conflicts with existing rights; or
6. The proposed use threatens to prove detrimental to the public interest.
(Added to NRS by 1991, 1368)