1. Acquire and provide without cost to the operating entity the land, easements and rights-of-way necessary for the construction of those projects.
2. Hold and save harmless the cooperating entity free from any claim for damages arising from the construction, maintenance and operation of those projects.
3. Maintain and operate all works in accordance with regulations prescribed by the cooperating entity.
4. Establish and enforce flood channel limits and regulations, if any, satisfactory to the cooperating entity.
(Added to NRS by 1961, 435; A 1987, 724)