13-4-40. Emergency subcontracting.
Subcontracting any portion of the work in excess of the listing threshold as to which no subcontractor was designated in the original bid shall be permitted only in the case of public emergency or necessity and then only upon a written finding by the using agency setting forth the facts constituting the emergency or necessity.