73-3b-102.    Definitions.      As used in this chapter:
      (1)  "Artificially recharge" means to place water in an aquifer:
      (a)  by means of:
      (i)  injection;
      (ii)  surface infiltration; or
      (iii)  another method; and
      (b)  for the purposes of:
      (i)  storing the water; and
      (ii)  recovering the water.
      (2)  "Division" means Division of Water Rights.
      (3)  "Recharge permit" means a permit issued by the state engineer to construct andoperate a recharge project.
      (4)  "Recharge project" means to artificially recharge water into an aquifer.
      (5)  "Recovery permit" means a permit issued by the state engineer to construct andoperate a recovery project.
      (6)  "Recovery project" means to withdraw from an aquifer water that has been artificiallyrecharged pursuant to a recharge permit.
Amended by Chapter 107, 2010 General Session